Cement project

Bestway Cement – 2,400 m³/day Canal Water Treatment Plant

Canal water pre-treatment with a coagulant- and flocculant-aided lamella clarifier for utilities at Bestway Cement's Mianwali plant.

Bestway Cement – 2,400 m³/day Canal Water Treatment Plant
ISO 9001:2015 certified
ClientBestway Cement
LocationMianwali, Punjab
Capacity2,400 m³/day
CommissionedApril 2023

Bestway Cement is Pakistan’s second-largest cement manufacturer, with an annual production capacity of 10.7 million tonnes per annum. The company is listed on the Pakistan Stock Exchange in Karachi. Bestway Cement recently commissioned its 5th plant site in Mianwali (Punjab), which will increase its annual production capacity to 12.9 million tonnes.

Scope of Chemical Kinetics

Chemical Kinetics supplied pre-treatment for utilities, including the treatment of canal water. This pre-treatment involves sedimentation with a lamella clarifier aided with coagulant and flocculant. Canal water carries a high turbidity value, which requires treatment before entering the RO plant or cooling tower.

Chemical Kinetics provided complete civil design, equipment, and on-site installation of the plant. The plant was successfully commissioned in April 2023.

Project gallery

On site

Plant overview with sedimentation basins and filter house
Raw canal water entering the settling basin
Pressure filter battery
Clarified water overflow channel
Sludge drying beds
Pressure filters and interconnecting pipework
Treated water outlet channel